摘要
就国内某电厂SGT5-4000F燃气轮发电机组液压盘车系统的调试工作,对燃气轮发电机组液压盘车系统的基本原理、调试内容以及在调试过程中遇到的问题及解决办法加以介绍,为今后燃气轮发电机组液压盘车系统的调试提供借鉴与参考。
According to the commissioning of hydraulic turning gear system of SGT5 -4000F gas -turbine generator in a do- mestic power plant, the basic principle and commissioning contents of hydraulic turning gear system in this gas - turbine gen- erator are introduced as well as the problems encountered during commissioning and the corresponding solutions, which can provide a reference for the future commissioning of hydraulic turning gear system in other gas - turbine generators.
出处
《四川电力技术》
2016年第1期82-86,共5页
Sichuan Electric Power Technology
关键词
燃气轮发电机组
液压盘车
转速
gas -turbine generator
hydraulic turning gear
rotating speed