基于不确定完成时间的项目进度控制模型及其应用 被引量:4

Introduction and Application of Project Schedule Control Model Based on Uncertain Completion Time
下载PDF
导出
摘要 对电子装备研发过程中的进度控制问题进行了研究。通过电子装备研发过程的分析,指出各步骤完成时间的不确定性是其主要特征,针对传统项目进度控制方法存在的假设前提过于理想化,在实际应用中偏差较大的问题,提出了基于不确定完成时间的解决方案,以关键路径算法为基础,将研发过程中某一任务的完成时间设置为一个时间范围内的某一点,建立数学模型,通过最小化相同状态下当前方案与最优解方案之间的差异,达到调整项目计划安排的目的。实验证明,该方案更贴近于电子装备项目研发的实际,可以有效地控制项目进度并优化。 The process control problem in the development provess of electronic equipment is analyzed.The analysis of electronic equipment development process proves that the uncertainty on the completion time of each step is the main feature.For that the assumption of the traditional project schedule control methods realistic and there is large deviation in practical application,a solution based on uncertain completion time is proposed.Based on critical path algorithm,the completion time of task is set as a point within a time scope,and a mathematical model is established to the project plan by minimizing the difference between the scheme and optical solution under the same status.The experiment proves that the proposed solution is more close to the actual project of research and development of electronic equipment,and can effectively control and optimize the project schedule.
出处 《舰船电子工程》 2016年第1期104-107,共4页 Ship Electronic Engineering
关键词 电子装备研发 关键路径算法 不确定完成时间 项目进度控制 electronic equipment research and development critical path algorithm uncertain completion time project schedule control
  • 相关文献

参考文献9

  • 1Keefer D. Allocation planning for RD with uncertain- ty and multiple objectives [J]. IEEE Transactions on Engineering Management, 2011,52 (1) : 8-14.
  • 2Pappas A. , Remer S. Measuring RD productivity [J]. Research Management, 2010,38(3) : 15-22.
  • 3Song Lisa Z. Song Michael. The role of information technologies in enhancing RD marketing integration: An empirical investigation[J]. Journal of Product Inno- vation Management, 2011,27 (3) : 382-401.
  • 4Nakamura Yoshiaki, Watanabe Chirico. Management and the effect of MITI's RD project: Case study from a supercomputer project [J]. Tec Novation, 2013, 23 (3) :221-238.
  • 5李欣先.基于R&D项目阶段的评估研究[J].河北工业大学学报,2012(12):13-14.
  • 6周小桥.关键路径法:确定项目的工期及活动的时差[J].项目管理技术,2006(3):73-76. 被引量:4
  • 7朱曙.项目进度控制方法从CPM/PERT到CCM[J].硅谷,2008(2):83-83. 被引量:1
  • 8Lawrence P Leach. Critical Chain Project management Improves project Performance[J]. Project Management Journal, 2009 (6) : 39-52.
  • 9Tolga A. Cagri. Fuzzy multicriteria RD project selec- tion with a real options valuation model[J]. Journal of Intelligent and Fuzzy Systems, 2011,19(4-5) .. 359-371.

共引文献3

同被引文献7

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部