摘要 IEC61850系列标准整体上将数字化变电站通信网络分为站控层、间隔层和过程层,采用交换机网络进行通信。过程层网络设计的合理性在很大程度上决定了变电站运行的可靠性,其组网方案也直接影响保护、控制功能的实现以及网络设备的投资。结合某220k V工程,介绍了过程层网络SV与GOOSE共网时的组网方案及交换机配置。 IEC61850 series standard divides the digital substation communication network into the station control layer,spacing layer and process layer,in whole,communication with the network switch. The process layer network design largely determines the reliability of the transformer substation,the network scheme directly affects the protection,implementation of control function and of investment of network equipment. This paper combine a 220 k V project,which introduces the process of network layer network SV and GOOSE network. Then it introduces the switch configuration.
出处 《电气开关》 2016年第1期89-93,共5页 Electric Switchgear
关键词 交换机配置 过程总线 GOOSE LAN-switch configuration process bus network GOOSE
  • 相关文献

参考文献4

二级参考文献21

  • 1刘永华,张春峰,魏勇,李志超,任歌武.数字化变电站过程层组网技术[J].农村电气化,2009(1):29-30. 被引量:3
  • 2孙一民,李延新,黎强.分阶段实现数字化变电站系统的工程方案[J].电力系统自动化,2007,31(5):90-93. 被引量:119
  • 3Q/GDW 383-2009智能变电站技术导则[S].2009.
  • 4Q/GDW441-2010智能变电站继电保护技术规范[s].北京:国家电网公司,2010.
  • 5Q/GDW396-2009IEC61850工程继电保护应用模型[S].
  • 6刘振亚.国家电网公司输变电工程通用设计[M].2011版.北京:中国电力出版社,2011.
  • 7IEC 61850 - 8 - 1 -- 2002, Communication networks and sys- tems in substation Part 8 - 1 : Part 8 - 1 : Specific communica- tion service mapping (SCSM) - Mappings[S].
  • 8DL/T5149~200l,220kV~500kV变电所计算机监控系统设计技术规程[s].
  • 9Specific Communication Service Mapping (SCSM)-Sampled Values over ISO/ IEC8802-3. IEC 61850-9-2 .
  • 10Communication Requirements for Functions andDevice Models. IEC61850-5 .

共引文献16

同被引文献32

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部