某核电厂循环水系统虹吸井布置优化分析 被引量:4

Analysis and Optimization of Circulation Water Siphon Well Position in a Nuclear Power Plant
原文传递
导出
摘要 在辽宁某核电厂循环水虹吸井的设计中,其选址有设于渤海岸边和设于厂区两个方案。在优化设计中,通过对循环水系统进行水力计算,分析了不同方案对循环水泵扬程的影响,以及对循环水系统的安全性和核电厂布置、机组运行的经济性的影响。经综合分析后,推荐采用将循环水虹吸井布置在厂区的方案。 In the design of circulating water siphon well in a nuclear power plant in Liaoning Prov- ince, there were two schemes that its position was located at the coast of Bohai Sea or in the plant. The influence of the two schemes on circulating water pump head, safety of circulating water system, layout of nuclear power plant and economy of unit operation was analyzed by hydraulic calculation of circulating water system in the optimization design. After comprehensive analysis, the circulating water siphon well was recommended to be located in the plant.
作者 刘扬 齐文明
出处 《中国给水排水》 CAS CSCD 北大核心 2016年第4期48-50,共3页 China Water & Wastewater
关键词 核电厂 循环水虹吸井 循环水系统 循环水泵扬程 nuclear power plant circulating water siphon well circulating water system circulating water pump head
  • 相关文献

参考文献4

  • 1李炜.水力计算手册[M].北京:中国水利水电出版社,2006.
  • 2西北电力院.电力工程水务设计手册[M].北京:中国电力出版社,2005.
  • 3DL/T5339--2006,火力发电厂水工设计规范[S].北京:中国电力出版社,2006.
  • 4GB/T50102--2003,工业循环水冷却设计规范[S].北京:中国计划出版社,2003.