摘要
以漳州光电职业技术学院项目2号楼、3号楼屋面工程中的斜屋面滑移问题为背景,对大坡度斜屋面结构层以上的施工工艺做法及遇到的问题进行研究和分析,对已经发生滑移问题的大坡度斜屋面采取措施进行治理并取得良好效果。
Starting from the true sample of sloping roof's slide in No. 2 and No. 3 buildings of Zhangzhou photoelectric vocational and technical college,construction techniques and encountered problems on large slope inclined roof conformation are analyzed. What's more,this paper also makes a summary about the measures,construction process. The results show that the treatments get good effects.
出处
《施工技术》
CAS
北大核心
2016年第3期88-90,共3页
Construction Technology