基于点位固定和方位修正的地铁长距离隧道基线测设和贯通误差预计方法 被引量:2

Base on the Measurement of the Baseline and the Breakthrough Error of the Metro Long Distance Tunnel Based on the Fixed Point and Azimuth Correction
下载PDF
导出
摘要 以东莞市轨道交通R2线工程西平站-蛤地站右线隧道为例,长距离隧道中部二次始发基线的控制点点位固定为前提,结合隧道导线测量二次始发基线的方位角修正,从理论上证明了此方法对于间接缩短隧道贯通距离、提高隧道控制点点位精度和横向贯通精度有显著的效果。 In this paper, taking Dongguan rail transit line project of Xiping railway Station to R2 clam stand right line tunnel as an ex- ample, long distance tunnel middle two originating baseline control bit fixed as the premise, combined with the tunnel traverse two o- riginating baseline azimuth correction, the method for shortening the distance from the tunnel through indirect proof theory and improve the tunnel control point position precision and lateral penetrating accuracy has a significant effect.
作者 梁爽
出处 《测绘与空间地理信息》 2016年第2期189-191,195,共4页 Geomatics & Spatial Information Technology
关键词 地铁长距离隧道 点位固定 方位角修正 贯通精度 subway tunnel long distance point fixed azimuth correction through accuracy
  • 相关文献

参考文献4

二级参考文献22

共引文献79

同被引文献18

引证文献2

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部