摘要
以云桂铁路项目为例,介绍了该项目施工段的地质特点,通过对不同路基基底处理工艺的分析,总结出换填配合土工格室垫层施工的膨胀路基基底处理技术,探讨了土工格室施工中的注意事项,保障了路基的施工质量和施工进度。
Taking the Kunming-Nanning rail project as an example,this paper introduced the geological characteristics of the project construction period,through the analysis on different sub-grade base process,summed up the expansive sub-grade base treatment technology of changing coordinated the geo-grid cell cushion construction,discussed the matters needing attention in geo-grid cell construction,guaranteed the construction quality and construction schedule of sub-grade.
出处
《山西建筑》
2016年第4期140-141,共2页
Shanxi Architecture
关键词
路基基底
土工格室
膨胀土
sub-grade base
geo-grid cell
expansive soil