介绍了桂林市斧子口水利枢纽的工程概况及坝址的工程地质情况,根据大坝基础地质条件,提出了斧子口水利枢纽大坝基础处理的目的和要求,论述了大坝基础的处理方案。
An introduction was made on the general situation of Fuzikou Hydraulic Complex, including the engi-neering geological conditions of dam site. The objective and requirements of main dam foundation treatment forFuzikou was put forward in view of the geological conditions. The treatment scheme is presented.
出处
《广西水利水电》
2016年第1期43-45,54,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
基础处理
固结灌浆
帷幕灌浆
混凝土塞
斧子口水利枢纽
Foundation treatment
consolidation grouting
curtain grouting
concrete plug
Fuzikou Hydraulic Complex