期刊文献+

中国工厂化建造的关键驱动因素和路径 被引量:7

Critical impetus and paths for off-site construction in China
下载PDF
导出
摘要 工厂化建造已在诸多国家得到积极推广,但在中国由于受到各种障碍因素的影响,迟迟没有成为建设工程实践领域的主流。工厂化建造作为一项新型生产方式,现阶段亟待分析影响其发展的关键性因素和驱动路径。文章通过案例调研、深度访谈和问卷调查,识别工厂化建造的外部驱动因素和内生驱动因素;通过结构方程模型(SEM)进行了实证研究和数据拟合,挖掘出五条关键驱动路径。研究结果表明,企业自身对可持续发展的追求是实施工厂化建造的本源,政府政策激励是一项积极的影响因素。 Off-site construction( OSC) has been actively promoted in many countries, but it has not become the mainstream in Chinese construction industry due to various obstacles. As a new innovation construction method,the critical factors and driven routs for promoting OSC should be explored in this stage. This paper employed case study, in-depth interview and questionnaire survey as research methods. Seven driving factors of off-site construction had been identified. Four Key Driven Route were developed based on structural equation model( SEM). The results shows that the enterprise to pursue sustainable development is the origin of off-site construction implementation, and government policies are significant factors.
出处 《重庆大学学报(社会科学版)》 CSSCI 北大核心 2016年第1期74-81,共8页 Journal of Chongqing University(Social Science Edition)
基金 国家社会科学基金青年项目(15CJY030)
关键词 工厂化建造 驱动因素 关键路径 结构方程模型 off-site construction driving factors driven paths structural equation model
  • 相关文献

参考文献26

  • 1纪颖波.建筑工业化发展研究[M].北京:中国建筑出版社,2010.
  • 2RICHARD R. Industrialised building systems : Reproduction before automation and robotics [J]. Automation in Construction, 2005 (14) :442 -451.
  • 3GIBB A, ISACK F. Re-engineering through pre-assembly: Client expectations and drivers [J]. Building Research & Information, 2003,31 (2) :146 - 160.
  • 4宋健.新型建筑工业化:建筑业转型发展的大机遇[J].中国建设报,2014(2):5-6.
  • 5刘禹.我国建筑工业化发展的障碍与路径问题研究[J].建筑经济,2012,33(4):20-24. 被引量:38
  • 6ARIF M, EGBU C. Making a case for offsite construction in China [J]. Engineering, Construction and Architectural Management, 2010,17 (6) :536 -548.
  • 7PAN W, SIDWELL R. Demystifying the cost barriers to offsite construction in the UK [J]. Construction Management and Economics, 2011,11 (29) : 1081 - 1099.
  • 8MAO C, et al. Major barriers to off-site construction: The developer' s perspective in China [ J ]. Journal of Management in Engineering,2015 (2) :04014043 - 1 - 8 DOI : 10. 1061/(ASCE) ME. 1943 - 5479. 0000246.
  • 9JAILLON L, POON C. Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study [ J]. Construction Management and Economics ,2008,26:953 - 966.
  • 10MAO C, et al. Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects[ J]. Energy and Buildings,2013,66:165 -176.

二级参考文献14

共引文献43

同被引文献61

引证文献7

二级引证文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部