摘要
某工程项目在场地十分狭小的条件下,采用"优化后浇带布置,加固地下室顶板设置加工场、材料堆放场以及定型化钢筋加工棚"等办法,既做到文明施工,又如期完工,取得经济与社会效益。
The field of project planning is very narrow. How to optimize the layout of the site and not to affect the time limit on the critical line is a problem to the construction unit. The project field is designed by optimizing the layout of the pouring belt and strengthening the processing field and so on. Under the condition of meeting the construction of safety culture,the completion is on the schedule.