环形预应力锚索失效对高内压隧洞内衬应力的影响 被引量:2

The Influence of Loop Prestressed Anchor Cable Failure on Stress of Inner Lining in High Pressure Tunnel
下载PDF
导出
摘要 受施工质量不良、防腐措施不规范、锚索张拉控制应力过高等因素的综合影响,环形预应力锚索存在失效的可能与现实。为揭示高内压隧洞内衬中环形预应力锚索破坏失效后对隧洞内衬应力的影响,以南水北调中线穿黄隧洞工程为例,采用三维有限元方法对隧洞内衬结构的应力分布进行模拟计算,假设标准段衬砌中不同部位、不同根数锚索的预应力完全失效,分析其对隧洞内衬应力的影响。研究结果表明,锚索失效后失效锚索附近局部区域预压应力减小,运行中的环向应力分布均匀性变差并出现了拉应力区;衬砌段中部锚索失效对内衬应力的影响区域较大但对应力值的影响较小,端部锚索失效对内衬应力的影响区域较小,但对应力值的影响较大;端部锚索失效和中部相邻两根锚索同时失效时的运行工况最大拉应力值超过混凝土设计抗拉强度,将引起混凝土的局部开裂,可能导致结构破坏。 Failure of loop prestressed anchor cable is possible and indeed exists,which was affected by factors such as poor quality of construction,non-standard in anti-corrosion measures,excessive control tension for prestressed anchor cable and so on.In order to reveal the influence of loop prestressed anchor cable failure on stress of bonded prestressed tunnel lining,this paper took the Yellow River-crossing tunnel as the engineering background.Three-dimensional finite element method was utilized to simulate the stress distribution of tunnel lining.The influence of anchor cable failure at different location and different numbers of failed cables on stress of the inner lining in high pressure tunnel was analyzed on the premise that the prestress of failed anchor cable had totally lost.The results of the research show that the compressive stress decreases in the partial area near the failed anchor cable and the distribution of loop stress becomes nonuniform and some tensile stress areas appear.Anchor cable failure in the middle of the lining segment would lead to a larger affected area but less influence on compressive prestress.In contrast,anchor cable failure at the end of the lining segment would lead to a smaller affected area but more influence on compressive prestress.The maximum value of tensile stress exceeds the concrete tensile strength when the anchor cable at the end of the lining segment failed or both of two adjacent anchor cables failed in the middle of the lining segment,which would lead to concrete crack and do harm to the structure.
作者 王欣 曹生荣
出处 《水电能源科学》 北大核心 2016年第2期102-106,共5页 Water Resources and Power
基金 国家自然科学基金项目(51079107) 中央高校基本科研业务费专项资金项目(5082022)
关键词 预应力衬砌 三维有限元 锚索失效 应力分析 高内压隧洞 prestressed lining three-dimensional finite element anchor cable failure stress analysis high pressure tunnel
  • 相关文献

参考文献5

二级参考文献25

  • 1谢小玲,苏海东,陈琴.穿黄隧洞预应力衬砌结构三维非线性有限元分析[J].人民长江,2008,39(24):6-7. 被引量:7
  • 2薛建阳,赵鸿铁,杨勇,李俊华,王彦宏.型钢混凝土柱粘结滑移性能及ANSYS数值模拟方法研究[J].建筑钢结构进展,2006,8(5):8-16. 被引量:24
  • 3付温.高效预应力混凝土工程技术[M].北京:中国民航出版社,1996..
  • 4付温,高效预应力混凝土工程技术,1996年
  • 5杜拱辰,部分预应力混凝土,1990年
  • 6杜拱辰,现代预应力混凝土结构,1988年
  • 7何得湛.预应力计算在圆形水池中的应用[J].土木工程学报,2000,(4):109-110.
  • 8林秀山,沈风生.小浪底工程后张预应力混凝土研究与实践[M].郑州:黄河出版社,1999.
  • 9Su Xiaozu,Zhu Bolong.Algorithm for hysteresis analysis of prestressed concrete frames.Journal of Structural Engineering,ASCE,June 1994,120(6):1732 ~ 1744.
  • 10Schupack M A.Survey of the Durability Performance of Post-Tensioning Tendons[J].ACI Journal,1998,75 (10):501 ~ 510.

共引文献58

同被引文献25

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部