期刊文献+

共享工地仓储空间信息下的建筑供应链协同研究

Study on Construction Supply Chain Collaboration with Shared Construction Site Storage Space Information
下载PDF
导出
摘要 为了分析工地仓储空间容量不确定信息对建筑材料配送决策和总承包商仓储决策的影响,在总承包商传统材料接收政策和总承包商成本最优材料接收政策两种情形下,分别建立了传统材料供应模式和总承包商主导供应商无合作模式的供应链决策模型。通过Monte Carlo方法模拟材料供应的整个过程,对比不同模式下供应链上各成员的最优决策和收益,发现相对于传统材料供应链,总承包商主导供应商无合作供应链更有利于实现供应链协同,特别是材料货源充足时,材料供应商之间不需要合作就可实现建筑供应链的帕累托最优;当材料货源不充足时,需要通过材料供应商间的合作,实现建筑供应链的帕累托最优。 In this paper, in order to research the influence of the uncertainty of the construction site storage space information on the construction material distribution decision-making process and the head contractor storage decision-making process, we established the supply chain decision-making model for the traditional material supply mode and the head contractor dominated mode with no cooperation among the suppliers for tbe two scenarios where the head contractor practiced the traditional material acceptance policy and the cost- optimized material acceptance policy, simulated the whole operational process of the supply chain using the Monte Carlo method, compared the optimal decisions and benefits of the supply chain members under different modes, and at the end, elaborated on the findings reached.
作者 郑海莎
机构地区 西南交通大学
出处 《物流技术》 2016年第1期131-135,共5页 Logistics Technology
基金 国家留学基金管理委员会访问学者项目(201507005035) 四川省科技厅软科学项目(2014ZR0170) 成都市科技项目(2015-RK00-00003-ZF)
关键词 工地仓储空间 信息共享 建筑供应链 协同 空间约束 多供应商 construction site storage space information sharing construction supply chain collaboration space constraint multiple supplier
  • 相关文献

参考文献15

  • 1Koskela L.Applicaton of the New Production Philosophy to Constmc- tion[R].California Stanford University,1992.
  • 2许杰峰,雷星晖.基于BIM的建筑供应链管理研究[J].建筑科学,2014,30(5):85-89. 被引量:23
  • 3Sobotka A,Czarnigowska A.Analysis of supply ststem models for plan- ning construction projects[J].Journal of Civil Engineering and Manage- ment,2005,6(1):73-82.
  • 4Cui R,Allon G,Bassamboo A,Mieghem J A V.information Sharing in Supply Chains:An Empirical and Theoretical Valuation[J].Management Science,2015,61(11):2 803-2 824.
  • 5Dissanayaka S M,Kumaraswamy M M.Evaluation of factors affecting time and cost performance in Hong Kong building projects[J].Engi- neering, Construction and Architectural Management,1999,6(3):287- 298.
  • 6Briscoe G,Dainty A.Construction supply chain integration: an elusive goal?[J].Snpply chain management: an international journal,2005,10(4): 319-326,.
  • 7许婷.工程项目采购供应链中的竞合博弈[J].中国管理科学,2009,17(1):83-88. 被引量:26
  • 8Lamming,R.Beyond partnership: strategies or innovation and lean sup-ply[J].Social Science Electronic Publish- ing,1994,25(3):425- 426.
  • 9Hamza A,Djebarni R, Hibberd P.The im- plication of partner- ship success within the UK construction industry supply chain [M].//Profitable part- nering in construction procurement, 1999.
  • 10Bankvall L,Bygballe, L E.Dubois A,Jahre M.Interdependence in supply chains and projects in con- struction[J].Supply Chain Management: An International Journal,2010,15(5): 385-393.

二级参考文献54

共引文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部