摘要
文章主要阐述了京沪高速铁路中移动模架现浇梁施工中的主要技术措施,包括技术指标、拼装工艺、过孔控制、现浇梁施工及安全控制等方面。另外,还对功效分析以及施工中的新技术、新方法以及安全管理措施进行了介绍。
The paper introduces the main technique measures in the construction of cast-in-place girder with the movable module in the Beijing-Shanghai high-speed railway, which include the technique index, assembly technique, cross span control,cast-in-place girder construction and safety control. Furthermore, the effect analysis,the new technique and method in the construction and the safety management measure are introduced.
出处
《东北水利水电》
2016年第2期9-11,71,共3页
Water Resources & Hydropower of Northeast China
关键词
移动模架
现浇梁
施工技术
movable module
cast-in-place girder
construction technique