摘要 介绍了唐家山堰塞湖泄洪洞预留岩埂拆除的爆破设计方案及施工技术,进行了分析与总结,结果表明:岩埂拆除底坝工程满足设计要求,无残留岩埂,水下门页、门槽完好,其方法可供相关工程参考。 In the spillway tunnel of the Tangjiashan dammed lake, the remained rock ridge is demolished by blasting. Design of the blasting scheme and construction techniques adopted are summarized. It shows that the blasting project is successful. While the rock ridge is totally removed, the underwater gates and slots are still in good It could be a useful reference for similar projects. demolition condition.
出处 《水电与新能源》 2016年第2期16-20,38,共6页 Hydropower and New Energy
关键词 堰塞湖 岩埂拆除 爆破设计 施工技术 dammed lake rock ridge demolition blasting scheme design construction technique
  • 相关文献

参考文献3

  • 1DL/T 5135—2013,水电水利工程爆破施工技术规范[S].
  • 2GB6722--2014爆破安全规程[S].
  • 3SL47-94,水工建筑物岩石基础开挖施工技术规范[S].

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部