摘要
鉴于电气一次设备在设计、制造、安装及试验等方面的质量控制好坏直接影响着机组投产发电目标能否顺利实现,介绍了呼和浩特抽水蓄能电站电气一次设备安装项目管理过程中出现的具有代表性的问题及缺陷,对相关原因进行了分析,提出了处理措施,并针对性地进行了总结及反思,可供相关工程参考。
Quality control of the design, manufacture, installation and trial test of the primary electrical equipment in power stations will directly affect the operation of the generator units. Thus, management experience of the primary electrical equipment installation project in Hohhot Pumped Storage Power Station is summarized. Several typical issues are diseussed and corresponding treatment measures are proposed. It could be a useful reference for similar projects.
出处
《水电与新能源》
2016年第2期55-57,共3页
Hydropower and New Energy
关键词
抽水蓄能电站
电气一次
安装项目管理
总结
反思
Hohhot Pumped Storage Power Station
primary electrical equipment
installation project management
summary
introspection