介绍安哥拉洛马乌水电站4号发电机组发生抬机和碰刮的情况,以及抬机、碰刮的原因分析和处理。通过分析现场反馈的数据、报告、照片、视频等信息,厘清了机组碰刮和抬机两个故障的非关联性,并综合各方意见,提出了具体的处理方案。机组经处理,能够按额定出力,运行平稳,满足了业主限期修复发电的要求。
The paper introduces the turbine lifting and scraping faults of No.4 hydro-generator set of the project as well as the cause analysis and treatments on the faults. The two faults have been proven non-relevant through analyzing the site data, report, photos, and videos, etc. Then, specific solutions are presented by summarizing the views of all parties, ensuring the smooth operation under rated output, and meantime satisfying the Employer's time requirements on restoration of the power station.