以上海港外高桥港区二期和三期码头为例,为减少码头加固改造施工对生产运营的影响,分析码头加固改造工程的现状,确定桩基、面层和系船柱等施工中所采取的应对措施,并合理安排施工流程,保障码头生产运行正常。
The Waigaoqiao Terminal Phases II and III of Shanghai Port are taken as an example. To reduce the construction influence on wharf renovation project, the conditions of wharf renovation project construction are analyzed. The measures on surface and bollard, mooring pile are ascertained with technology and reliability, and the construction process and safe operation are achieved to ensure the port operation.