摘要
施工控制测量是隧洞贯通的根本保证,长大距离的地下洞室开挖施工,对贯通中误差要求很高,而线性的隧洞工程内部不利测量控制网的布置,采用高等级的仪器,正确的测量方法进行贯通中误差、平面测量、高程测量,可以确保TBM开挖方向,保证隧洞的贯通质量。
Construction control survey is the basic guarantee for the tunnel holing-through, the excavation and construction of underground cavern in long distance has high demand on errors for run-tunnel through. But, internal tunnel project in linear is not suitable for the layout of control network, adopting high-level instrument and correct survey method for holing-tunnel through, plane survey and elevation survey to ensure the excavation direction of TBM, so as to ensure the quality of run-tunnel through.
出处
《黑龙江水利科技》
2015年第8期60-62,共3页
Heilongjiang Hydraulic Science and Technology
关键词
地下洞室
施工
测量
TBM开挖方向
施工导线
高程控制
允许误差
underground cavern
construction
survey
TBM excavation direction
construction line
elevation control
allowable error