国内某LEED认证项目全过程调试实操案例 被引量:1

A Case Study of Full Stage Commissioning in a LEED Certified Project
下载PDF
导出
摘要 介绍了LEED调试概念及其在LEED认证系统中的分值设定、具体要求等。结合国内某已经获得LEED认证项目的实操,对LEED调试在此项目完整阶段——设计、招标、施工、运行阶段——的操作和执行情况进行说明。其将对建筑行业内同类型或其他类型项目的机电调试工作起到借鉴作用。 The definition of LEED Commissioning is introduced, as well as its credit weighting and requirements in LEED rating system. A real case a LEED certified project is analyzed for explanation of the LEED commissioning procedure, practice and implementation in the full stage, including design, procurement, construction and operation and maintenance. The case analysis will set a good example for the projects which are in both the same type and the different types when conducting MEP commissioning.
作者 刘宇钏
出处 《建筑节能》 CAS 2016年第2期92-96,124,共6页 BUILDING ENERGY EFFICIENCY
关键词 LEED 认证 调试 机电系统 全过程 实操 LEED certification commissioning MEP full stage hands on experience
  • 相关文献

参考文献1

  • 1USGBC.LEED Reference Guide for Green Building Design and Con- struction[S].2009 Edition.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部