摘要
介绍了LEED调试概念及其在LEED认证系统中的分值设定、具体要求等。结合国内某已经获得LEED认证项目的实操,对LEED调试在此项目完整阶段——设计、招标、施工、运行阶段——的操作和执行情况进行说明。其将对建筑行业内同类型或其他类型项目的机电调试工作起到借鉴作用。
The definition of LEED Commissioning is introduced, as well as its credit weighting and requirements in LEED rating system. A real case a LEED certified project is analyzed for explanation of the LEED commissioning procedure, practice and implementation in the full stage, including design, procurement, construction and operation and maintenance. The case analysis will set a good example for the projects which are in both the same type and the different types when conducting MEP commissioning.
出处
《建筑节能》
CAS
2016年第2期92-96,124,共6页
BUILDING ENERGY EFFICIENCY
关键词
LEED
认证
调试
机电系统
全过程
实操
LEED
certification
commissioning
MEP
full stage
hands on experience