摘要
水利工程施工通常土石方挖填量较大,开挖点、回填点及弃渣点较多。如何有效利用可用料,并对可用料进行中转堆存、对弃渣料进行有序堆放,基础工作之一就是土石方平衡计算。介绍在设计工作中如何优化土石方平衡计算表格,提高土石方平衡计算效率,使土石方平衡计算直观、易懂、快速。
Hydraulic engineering often involves a great quantity of cut-fill volumes, excavation points, backfill points and slag points. It is earth-rock allocation calculation that offers solution for the effective use and the transit storage of available materials, and the orderly stack of slag materials. This paper discusses the optimization of earth-rock allocation calculation table and the efficiency of the calculation, with the aim to make the calculation visual, easy and fast.
出处
《广东水利电力职业技术学院学报》
2015年第4期26-27,43,共3页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
土石方平衡
计算表格
快速计算
earth-rock allocation
calculation table
fast calculation