摘要
结合山西中部引黄工程的水文地质条件,分析了小断面隧洞快速掘进的施工难点及关键因素,并从施工部署、加宽段距离、工序衔接等方面,阐述了具体的施工方法,总结了施工安全、质量保障措施,实现了小断面隧洞的快速施工。
Combining with hydrological conditions of Yellow River diversion project in middle part of Shanxi province,the paper analyzes smallsection tunnel excavation digging construction difficulties and critical factors,describes specific construction methods from aspects of construction arrangement,widening section distance and construction procedure coherence,and finally summarizes construction safety and quality guarantee measures. As a result,it realizes fast small-section tunnel construction.
出处
《山西建筑》
2016年第5期182-184,共3页
Shanxi Architecture
关键词
小断面隧洞
开挖掘进
超前支护
掌子面
small-sectional tunnel
excavation digging
advanced support
tunnel face