摘要
简述了工程变更的含义、范围和内容,对工程索赔的概念进行了介绍,分析了工程索赔产生的原因,从工作人员业务能力、合同管理、施工现场资料收集等方面,提出了做好工程变更和工程索赔工作的措施,以降低工程成本,增加企业效益。
The thesis briefly describes the definition,scope and content of engineering change,introduces the concept of engineering claim,analyzes engineering claim causes,and puts forward measures of doing well in engineering change and engineering claim from aspects of staff abilities,contract management and construction field data collection,with a view to reduce engineering cost and increase enterprise benefits as well.
出处
《山西建筑》
2016年第5期241-242,共2页
Shanxi Architecture
关键词
工程变更
工程索赔
合同
成本
engineering change
engineering claim
contract
cost