4SONG G, STANKUS J. Control mechanism of a tensioned bolt system in the laminated roof with a large horizontal stress [ A ]The 16th Int. Conf. on Ground Control in Mining [ C] . Morgantown, West Virginia, [s.n. ], 1997: 167-172.
5侯朝炯,J Coal Science & Engineering,1995年,1卷,1期,62页
6陈炎光,中国煤矿巷道围岩控制,1994年
7康红普 林健.煤巷锚杆支护成套技术在潞安矿区的应用.煤炭学报,2001,.
8L A Brun,J Makllet, P Hinsinger, et al. Evaluation of copper avail- ability to plants in copper- contaminated vineyard soils[J]. Environ- mental Pollution,2001,111:293- 302.
9Song Guo,Stankus J.Control mechanism of a tensioned bolt system in the laminated roof with a large horizontal stress[A].16th Int.Conf.on Ground Control in Mining[C].Morgantown:West Virginia,1997.
10Villaescusa E,Schubert C J.Monitoring the performance of rock reinforcement[J].Geotechnical and Geological Engineering,1999,17(3):321~333.