5Khazaei S,Shimada H,Matsui K.Analysis and prediction of thrust in using slurry pipe jacking method.Tunnelling and Underground Space Technology,2004,(19):356.
6Barla M,Camusso M,Aiassa S.Analysis of jacking forces during microtunnelling in limestone.Tunnelling and Underground Space Technology,2006,(21):668-683.
7Pellet-Beaucour A L,Kastner R.Experimental and analytical study of friction forces during microtunnelling operations.Tunnelling and Underground Space Technology,2002,(17):83-97.