摘要
概述了国外和上海地区SMW工法的开发和应用情况 ,概要讨论了SMW工法施工中水泥土配合比、型钢水泥土复合桩的形式、设计强度计算、型钢起拔技术研究等问题 。
The development and applications of SMW enclosure method both in Shanghai and abroad are reviewed and summarized. The cement mix proportion, modality of shaped steel and soil cement composite piles, calculation of designed strength, extracting tech of the shaped steel during the construction of SMW method are discussed in summary. Several project cases with SMW method and a homemade deep mixer with four axial are presented in brief.
出处
《江苏地质》
2002年第2期101-105,共5页
Jiangsu Geology