摘要
为确保核电厂安全经济运行,核电厂分散控制系统(DCS系统)稳定、高速的采集功能在机组调试和运行过程中起着至关重要的作用。SOE信号高速采集速率,给系统验证提出了很高的要求。本文在对被测对象进行全面分析后提出了一套测试方法。此套测试方法适用于核电厂DCS开发设计、系统集成、出厂验收测试等环节。
In order to ensure safe and economic operation of nuclear power plants, stable and high speed data-acquisition function plays an essential part in Nuclear Power DCS system. DCS control station is a key component of the Nuclear Power DCS system. Owing to high real time demands, communities on field bus puts forward higher requirement for system verification. A set of test methods are proposed after comprehensive analysis of the measured object. These sets of test methods are applicable to the DCS development and design, system integration, factory acceptance testing session.