赞比亚伊泰兹水电站厂房上游墙止推环结构应力分析 被引量:1

Analysis on Structural Stress of Thrust Collar at Powerhouse Upstream Wall,Itezhi Hydropower Project
下载PDF
导出
摘要 应用三维有限元计算伊泰兹水电站厂房上游墙止推环结构及其附近混凝土应力,并依据止推环及其邻近压力钢管在蜗壳不平衡水推力作用下的结构应力进行安全性评价。环后混凝土结构应力分布对结构配筋计算具有一定的参考价值。 By application of 3D finite element method,stresses of the thrust collar at powerhouse upstream wall and its surrounding concrete are calculated. Furthermore,their safety is assessed in accordance with structural stresses of the thrust collar and its neighboring penstock under the action of the unbalanced hydraulic thrust of the spiral case. The structural stress distribution of the concrete behind the thrust collar is referred to the reinforcement arrangement of the structure.
作者 王红强
出处 《西北水电》 2016年第1期37-38,42,共3页 Northwest Hydropower
关键词 止推环 不平衡水推力 结构应力 伊泰兹水电站 thrust collar unbalanced hydraulic thrust structural stress
  • 相关文献

参考文献8

二级参考文献83

共引文献99

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部