2Southern Company Service, Inc,. Demonstration of Innovative Applications of Technology for CT121 FGD Process at Georgia Power' s Plant Yates. Final Report. January 1997,3b:15- 17.
3Enoch G, Spiering W, Tigchelaar P, et al. Treatment of waste water from wet lime(stone) flue gas desulfurization plants with aid of crossflow microfiltration[J]. Separation Science and Technology, 1990,25(13-15):1587 - 1605.
4Lefers J, Broeke, van den W, et al. Heavy Metal Removal from Waste Water from Wet Lime(stone)-Gypsum Flue Gas Desulfurization Plants.Water Research, 1987,21(11):1345 - 1354.
5Nielsen P. Christensen T, Vendrup M. Continuous removal of heavy metals from FGD wastewater in a fluidized bed without sludge generation[J].Wat Sci Tech, 1997,36(2 - 3) :391 - 397.
6Enoch G, van den Broeke W, Spiering W. Removal of heavy metals and suspended solids from waste water from wet lime(stone)-gypsum flue gas desulphurization plants by means of hydrophobic and hydrophilic crossflow microfiltration membranes[J] .Journal of Membrane Science, 1994,(87):191- 198.