期刊文献+

DBR理论求解柔性作业车间调度问题 被引量:5

Solving Flexible Job Shop Scheduling Problem Using DBR Theory
下载PDF
导出
摘要 针对柔性作业车间调度完工时间最小问题,提出一种结合DBR(鼓-缓冲器-绳子)理论和改进遗传算法的方法。在问题初始化时,建立瓶颈机器识别机制改善初始化方法,提高初始解的质量;在运算过程中依据关键路径建立瓶颈机器的识别机制和调度策略。为了更好保留每代中的优良解,采用外部精英库对优良解进行解保留。运用提出的算法求解基准测试问题,实验结果验证了算法的可行性和有效性。 A hybrid method based on DBR (Drum-Buffer-Rope)and improved genetic algorithm is proPosed for flexible job shop scheduling problems with the objective to minimize the makespan. In the initialization, a bottle- neck machine recognition mechanism is proposed to improve initialization methods and to enhance the quality of the initial solution. In the process of computing based on the critical path, a bottleneck machines identification mechanisms and scheduling strategy are esfablished. In order to keep the excellent solutions in each generation, the external libraries is adopted. Benchmark problems are solved by the proposed algorithm, and computational results show that the proposed method is feasibility and effective.
作者 张国辉
出处 《运筹与管理》 CSSCI CSCD 北大核心 2016年第1期53-58,共6页 Operations Research and Management Science
基金 国家自然科学基金资助项目(61203179) 教育部人文社会科学研究青年基金项目(12YJC630285) 河南省教育厅科学技术研究重点项目基础研究计划(14A460004 14A630009)
关键词 柔性作业车间调度 DBR理论 遗传算法 关键路径 flexible job shop scheduling DBR theory genetic algorithm critical path
  • 相关文献

参考文献9

二级参考文献58

共引文献170

同被引文献37

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部