炼钢厂连铸机的开浇时间决策优化模型 被引量:2

An Optimization Model for Casting Start Time Decision of Continuous Caster in Steel Plant
下载PDF
导出
摘要 针对炼钢厂连铸机开浇时是否连浇以及开浇时间确定等问题,从钢厂生产线上待加工的铁水/钢水金属资源平衡的角度,建立了以连铸生产总效益最大为目标函数的连铸机开浇决策的混合整数规划模型,并用基于MATLAB软件的YALMIP优化工具进行模型的求解.针对某钢厂的实际情况进行模型的应用测试,结果表明:模型可以优化决策连铸机各浇次的开浇时间,有助于编制合理的炼钢厂生产调度作业计划,稳定各班次之间的生产条件,降低生产线上的积压金属量,为炼钢厂连铸机的有序开浇提供了技术手段. From the aspect of the resource balancing of the hot-metal / liquid-steel in a steel plant,a mixed integer linear programming model with the objective of maximizing the total benefit of continuous casters was established for casting start time decision of continuous caster( CSDCC).The model was solved by YALMIP optimizer based on MATLAB. Application tests were conducted with the instances from the practical production process in a steel plant to evaluate the proposed model. The results showthat the casting start time of continuous casters can be predicted accurately,which is beneficial to make a feasible schedule,to stabilize the production conditions for the shifting of working groups,and to reduce the quantity of hot-metal / liquid-steel stored in the production line. The CSDCC model provides a useful tool for steel plant to determine the optimized casting start time of continuous caster.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2016年第2期203-207,共5页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金资助项目(51474044 50574110) 重庆市科技攻关重点项目(CSTC2011AB3053)
关键词 连铸机 开浇决策 优化模型 安全库存 混合整数规划 continuous caster casting start time decision optimization model safe stock mixed integer linear programming
  • 相关文献

参考文献10

  • 1常春光,汪定伟,胡琨元,郑秉霖.嵌入调整模型的CBR技术的炼钢调度系统[J].东北工学院学报,2004,25(6):531-534. 被引量:4
  • 2Tang L X, Guan J, Hu (3 F. Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration [ J ]. Computers & Industrial Engineering,2010,58 (2) :239 - 248.
  • 3Hubert M,Wolfgang H, Wemer S. A scheduling system for the steelmaking-continuous casting process:a case study from the steel-making industry [ J ]. International Journal of Production Research,2009,47 (15) :4147 - 4172.
  • 4Tan Y Y, Liu S X. Models and optimization approaches for scheduling steelmaking-refming-continuous casting production under variable electricity price [ J ]. International Journal of Production Research ,2014,52 (4) : 1032 - 1049.
  • 5王闯,刘青,王彬,王宝,穆衍清,谢飞鸣,王柏琳,卢新春,张立强,白素宏.特殊钢厂炼钢-连铸调度模型[J].北京科技大学学报,2013,35(3):371-378. 被引量:8
  • 6YU Sheng-ping PAN Quan-ke.A Rescheduling Method for Operation Time Delay Disturbance in Steelmaking and Continuous Casting Production Process[J].Journal of Iron and Steel Research International,2012,19(12):33-41. 被引量:7
  • 7Li T K, Guo D F. Constraint-based approach for steelmaking- continuous casting rescheduling [ C ]//20th International Conference on Industrial,Engineering and Other Applications of Applied Intelligent Systems. Kyoto,2007 : 1108 - 1117.
  • 8Dong H Y, Huang M,Ip W H, et al. On the integrated charge planning with flexible jobs in primary stee/making processes [ J]. International Journal of Production Research ,2010,48 (21) .6499 -6535.
  • 9Kim S H , Whitt W. Statistical analysis with Little' s Law [J]. Operations Research ,2013,61 (4) : 1031 - 1045.
  • 10Yin R Y. Metallurgical process engineering [ M ]. Beijing: Metallurgical Industry Press ,2009 : 165 - 166.

二级参考文献27

  • 1庞新富,俞胜平,刘炜,郑秉霖,柴天佑.炼钢连铸动态智能调度系统的研究与开发[J].控制工程,2005,12(6):553-556. 被引量:21
  • 2李铁克,周健,孙林.连铸连轧和冷装热轧并存环境下的炼钢-连铸生产调度模型与算法[J].系统工程理论与实践,2006,26(6):117-123. 被引量:18
  • 3Numao M, Morishita S. Scheduling environment for steelmaking process [ A ], Proc 5th Conf on Artificial Intelligence Applications [ C ]. Washington D C: IEEE Computer Society Press, 1989. 279 - 286.
  • 4Shah M J, Damian R, Silverman J. Knowledge-based dynamic mheduling in a steel plant[A], Proc 6th Conf on Artificial Intelligence Applications [ C ], Washington D C:IEEE Computer Society Press, 1990. 108- 113.
  • 5Szelke E, Mdrkus G. A learning reactive scheduler using CBR/L[J]. Computers in Industry, 1997,33:31 - 46.
  • 6Angi V. How to ,solve complex problems with cases[J ],Engng Applic Artif lntell, 1996,9(4) : 377 - 384.
  • 7Shin K S, Han I, A case-based approach using inductive indexing for corporate bond rating [J ]. Decision Support Systems, 2001,32:41 - 52.
  • 8Park M K, Lee I, Shon K M. Using case based reasoning for problem solving in a complex production process[J]. Expert Systems with Applications, 1998,15 : 69 - 75.
  • 9liro H, Ignacio E G. A decomposition approach for the scheduling of a steel plant production [J ]. Computers and Chemical Engineering, 2001,25( 11 ) : 1647 - 1660.
  • 10Pacciarelli D, Pranzo M. Production Scheduling in a Steelmak ing-Continuous Casting Plant [J]. Computers and Chemical En- gineering, 2004, 28(12): 2832.

共引文献14

同被引文献24

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部