清河水库溢洪道进口导流墙施工破坏原因分析 被引量:3

Destruction cause analysis of guide wall of spillway inlet of Qinghe reservoir
下载PDF
导出
摘要 在清河水库除险加固工程溢洪道进水渠导流墙爆破施工中,对需要保留的导流墙产生了破坏,依据边墩爆破拆除时,爆破拆除监测结果,分析导致破坏的原因,是边墩拆除爆破造成的;施工缝和变截面处是结构抗力的薄弱部位;设计要求挡墙部位允许质点震动速度值7cm/s应当严格限制。建议采取静态爆破方法拆除建筑物。 The guide wall needing to preserve was destroyed in blasting construction of guide wall of spillway inlet tunnel in danger control and reinforcement engineering of Qinghe reservoir. Based on the monitoring results of blasting demolition of the abutment pier, the paper analyzes the destruction cause that the guide wall is the blasting demolition of the abutment pier, the construction joint and the variable cross-section are the weak parts of the structure reactance, the permissible particle vibration velocity of retaining wall is 7 cm/s with the strictly limited. The static blasting method is recommended to demolish the buildings.
作者 曹玉敏
出处 《东北水利水电》 2016年第3期62-64,72,共3页 Water Resources & Hydropower of Northeast China
关键词 爆破 破坏 原因 清河水库 blasting destroy cause Qinghe reservoir
  • 相关文献

参考文献1

  • 1GB50111-2006.铁路工程抗震设计规范[S].2006.

共引文献37

同被引文献16

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部