期刊文献+

基于生产优化调度的污染源头控制方案研究——以棉针织染整企业为例 被引量:3

Study on optimizing production schedule based on pollution source control: A case study in a cotton knitting dyeing mill
原文传递
导出
摘要 企业生产的优化调度是实现企业源头节水减排的重要手段。从污染源头控制出发,分析了棉针织企业间歇式生产特点和现行生产调度方法的不足,得出了生产订单与废水排放的关系,指出通过订单优化调度的方法可大量减少染缸清洗产生的废水。在此基础上,建立了染缸分组-订单分批-遗传算法集成生产调度方法,并说明了该方法的特点和一般执行规则。结合实际案例,对此调度方法进行验证,结果表明,在人工调度的基础上优化调度能实现近60%总订单数的再调度,增强了优化的可持续性,短时间内完全消除了深、中、浅色逆排的情况;同时,通过该方案能为企业节省30%的清洗染缸用水,研究结果证明,该方案有较好的环境效益和经济效益。 Optimal scheduling is an important measure to achieve water saving and emission reduction in enterprises. By setting off the schedule of which purpose was to control pollution from production source,the features of the intermittent production and the current scheduling inadequate were analyzed,and the link of production orders and wastewater discharge was established. On this basis,an integrated approach of vats grouping-orders batching-genetic algorithms was established,and then the features and its general implementation of the rules were described. The scheduling scheme was verified in a cotton knitting dyeing mill. The results showed that almost 60% of orders may be re-scheduled by the optimized schedule compared with existing schedule,and the sustainability is enhanced,and then the dark-middle-light color can be completely eliminated within short time. The mill can save 30% of the cleaning vat of water after optimizing production schedule,which environmental and economic benefits are significant.
出处 《环境工程学报》 CAS CSCD 北大核心 2016年第2期1010-1016,共7页 Chinese Journal of Environmental Engineering
基金 国家"水体污染控制与治理"科技重大专项(2012ZX07301-005)
关键词 源头污染控制 棉针织染整 废水 优化调度 遗传算法 source pollution control cotton knit dyeing wastewater schedule optimization genetic algorithms
  • 相关文献

参考文献12

  • 1姜伟立,袁增伟,吴海锁,毕军,孙丽.基于遗传算法的染色生产订单排序与节水研究[J].环境污染与防治,2011,33(4):16-19. 被引量:3
  • 2环保统计年鉴2013.北京:中国统计出版社,2013.
  • 3何珍宝.印染废水特点及处理技术[J].印染,2007,33(17):41-44. 被引量:68
  • 4Jiang Weili. Conserving water by optimizing production schedules in the dyeing industry. Journal of Cleaner Pro- duction, 2010 18(16-17) : 1696-1702.
  • 5Chan Kafai, Hui Chiwai. Scheduling batch production u- sing a stepwise approach. Industrial & engineering chemis- try research, 2003, 42(14) : 3505-3508.
  • 6Tan R. R., Foo D. C. Y., Ng D. K. S., et al. An ap- proximate mixed integer linear program ming (MILP) mod- el for the design of water reuse/recycle networks with mini- mum emergy. Asia-Pacific Journal of Chemical Engineer- ing, 2007; 2(6) : $66-574.
  • 7李可彪,金福江.染整生产优化排缸模型研究[J].武汉理工大学学报(信息与管理工程版),2008,30(5):693-695. 被引量:2
  • 8Li Hai, Zhang Jingxiao, Lieyan R. Scheduling optimiza- tion of construction engineering based on ant colony opti- mized hybrid genetic algorithm. Journal of Networks, 2013, 8(6): 1411-1416.
  • 9Fan Liya, Zhang Fa, Wang Gongming, et al. An effective approximation algorithm for the malleable parallel task scheduling problem. Journal of Parallel and Distributed Computing, 2012, 72(5): 693-704.
  • 10Kaihara T. , Kurose S. , Fujii N. A proposal on optimized scheduling methodology and its application to an actual- scale semiconductor manufacturing problem. CIRP An- nals-Manufacturing Technology, 2012, 61 ( 1 ) : 467-470.

二级参考文献46

共引文献76

同被引文献67

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部