期刊文献+

温州电网110kV及以上隔离开关运维检修管理新模式 被引量:4

Operation and Maintenance Management of 110 kV and above Isolating Switch of Wenzhou Power Grid and the Implementation
下载PDF
导出
摘要 总结温州电网110 kV及以上隔离开关运行中常出现的故障及检修中存在的问题,提出强化集中检修、工厂化检修,深化精益化检修,打造主动检修体系,展开差异化检修的管理模式,积极探索和实践科学高效的检修模式,并加强隔离开关大修和隐患治理执行力度,最终提高检修效率,有效提升了设备运行水平。 By summarizing frequent faults in the operation of 110 kV and above isolating switch of Wenzhou power grid as well as problems in maintenance, the paper suggests strengthening centralized maintenance and factory maintenance, deepening lean maintenance, creating proactive maintenance system and implementing differential maintenance management; besides, it aims to positively explore and implement scientific and ef- ficient maintenance mode and reinforce isolating switch overhauling and treatment of potential risks to improve maintenance efficiency and equipment operation level.
作者 陈植 李勇
出处 《浙江电力》 2016年第2期72-75,共4页 Zhejiang Electric Power
关键词 隔离开关 运维检修 集中检修 工厂化检修 精益化管理 差异化检修 isolating switch operation and maintenance centralized maintenance factory maintenance lean management differential maintenance
  • 相关文献

同被引文献33

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部