摘要
以某炼钢厂的改造建设为例,对设备更新所涉及的结构改造方法进行了分析,从设计与实施方面进行了论述,提出了投资少、工期短的改造方法,达到了新设备安装的工艺要求,解决了投资迅速见效与改造周期长之间矛盾的问题。
Taking the steel mill transformation as an example,the paper analyzes the structural transformation methods owning to equipment renovation,carries out a discussion from aspects of design and implementation,puts forward transformation methods with merits of few investment and short construction duration. As a result,it meets new equipment installation technology demands and solves the contradictory between fast investment efficiency and long transformation duration.
出处
《山西建筑》
2016年第6期41-42,共2页
Shanxi Architecture
关键词
厂房改造
加固设计
抽柱换梁
workshop transformation
reinforcement design
demolishing column and underpinning beam