摘要
采用简化计算、数值分析、现场实测相结合的方法,以宁和城际中和村站深基坑工程降水设计为例,根据其降水时间和坑内水量,计算了基坑降水所需的降水井数量和坑外地面沉降值,通过三维模拟得出了坑外水位的变化和地面沉降值,并结合现场实测数据验证了计算和模拟结果。
Applying simplified computation,numerical analysis and field survey method,taking deep foundation engineering dewatering engineering of Ninghe intercity Zhonghe village station as an example,according to dewatering time and water amount,the paper calculates dewatering well numbers and ground subsidence value. Through tri-dimensional simulation,it obtains water level and ground subsidence value. And combining with field survey data,it finally testifies the computing and simulating results.
出处
《山西建筑》
2016年第6期79-81,共3页
Shanxi Architecture
关键词
地铁车站
深基坑
降水设计
地面沉降
数值分析
subway station
deep foundation
dewatering design
ground subsidence