期刊文献+

既有线人工换梁方法 被引量:1

The artificial method of girder replacement in existing railway
下载PDF
导出
摘要 以某钢梁桥换梁改造工程为例,通过对该工程现场情况的分析,选用人工横向拖拉法换梁,论述了换梁施工的难点和主要工作量,并对换梁步骤进行了详细介绍,总结了施工中的注意事项,指出采用人工横移法换梁具有经济实用、操作简单、安全性高的优点。 Taking the steel bridge girder replacement transformation engineering as an example,through analyzing its engineering field conditions,the paper selects artificial horizontal pulling methods for girder replacement,discusses girder replacement construction difficulties and tasks,specifically introduces girder replacement procedures,and summarizes construction matters. In the end,it points out advantages of artificial horizontal girder replacing method,such as economic and practical,simple operation and safe and high performance.
出处 《山西建筑》 2016年第6期174-175,共2页 Shanxi Architecture
关键词 既有线桥梁 人工换梁 混凝土梁 预应力 existing bridge artificial girder replacement concrete girder prestress
  • 相关文献

参考文献2

  • 1高鹤江,刘修炜.铁路工务技术手册·桥涵(修订版)[M].北京:中国铁道出版社,2011.
  • 2TB 10106-2010,铁路工程地基处理技术规程[S].

共引文献40

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部