期刊文献+

基于“员工技能库”的多技能员工动态指派 被引量:2

Staff with Multi-Skills Assignment Based on Staff Skills Database
原文传递
导出
摘要 针对在复杂市场需求环境的新订单到达情况,具有不同技能数量和技能水平的多技能员工为完成新订单的指派问题,提出基于"员工技能库"的、满足交货期的多技能员工动态指派方案,给出了与实际情况相吻合的约束条件,建立相应的0-1整数规划模型.并设计了采用优先规则的启发式算法,在每次迭代中优先选择与订单最低需求基本匹配的员工加以指派任务,直至所有任务都完成指派,通过算例测试表明,基于"员工技能库"的动态指派方案能快速准确地进行员工指派. On the situation of complicated market demand,how to assign the staff with different skills and different levels to satisfy the new order is very important and difficult.Based on the staff skills database,an approach to assign the staff with different skills and levels to satisfy the different tasks in new order is proposed,which can satisfy the delivery period demand.First,the constraint conditions are analyzed and the 0-1 integer programming model is established.Then the heuristic algorithm according to priority rule is designed,which assigns the workers who satisfy the lowest demand of new order in each iteration.The calculating examples show that the approach based on the staff skills database can assign the staff with different skills and levels to the tasks of new order rapidly and accurately.
作者 李芳 张毕西
出处 《数学的实践与认识》 北大核心 2016年第3期95-105,共11页 Mathematics in Practice and Theory
基金 国家自然科学基金(71271060) 广东省自然科学基金(S2012010009278)
关键词 员工技能库 动态指派 多技能员工 启发式算法 staff skills database dynamic assignment multi-skills staff heuristic algorithm
  • 相关文献

参考文献10

  • 1Eitzen Guy,Panton D.Multi-skilled workforce,optimization[J].Annals of Operations Research,2004,127:359-372.
  • 2De Korvin A,Shipley M F,Kleyle R.Utilizing fuzzy compatibility of skill sets for team selection in multi-phase projects[J].J Eng Technol Manage,2002,19:307-319.
  • 3Park P S.The Examination of Worker Cross-train ing in a Dual Resource Constrained Job Shop[J].European Journal of Operational Research,1991,51:291-299.
  • 4王一帆,刘士新,陈迪.求解多技能人力资源约束的项目调度问题的两阶段算法[J].东北大学学报(自然科学版),2014,35(2):184-189. 被引量:12
  • 5Isabel Correia,Francisco Saldanha-da-Gama.A note on"branch-and-price approach for the multiskill project scheduling problem"[J].Optimization Letters,2014(8):1721-1734.
  • 6Soumia Ichoua,Michel Gendreau,Jean-Yves Potvin.Diversion Issues in Real-Time Vehicle Dispatching[J].Transportation Science,2000,34(4):426-438.
  • 7PAN Hanchuan,SUN Yanshuo,XIAO Guanyu.Dynamic assignment of emergency passenger flows after metro accidents[C]//ICTE 2011?ASCE 2011:2952-2958.
  • 8傅谦,张申生,汪良主.基于策略的适应性工作流资源动态分配技术[J].上海交通大学学报,2002,36(4):506-508. 被引量:8
  • 9Nam KC,Kwak Ks,Y u Ns.Simulation study of containerter minal performance.Journal of Waterway Port Coastal And Ocean Engineering-Asce,2002,128(3):126-132..
  • 10廖广瑞,刘振元,毕阳.多技能资源时间窗约束下项目调度研究[C]//26th Chinese Control and Decision Conference(CCDC).2014:4885-4891.

二级参考文献24

  • 1[1]Han Y, Sheth A, Bussler C. A taxonomy of adaptive workflow manage ment [A]. Bernstein A, Dellarocas C, Klein M. CSCW'98 Workshop on Adap tive Workflow [C].Seattle:ACM,1998.
  • 2[2]Du W M, Huang Y N, Shan M C, et al. Enterprise workflow resource mana gement [R]. Palo Alto:HP Software Technology Laboratory Technical Report HPL- 99-8,1999.
  • 3[3]Buffer C. Policy resolution in workflow management system [J]. Digital Technical Journal, 1999,6(4):34-35.
  • 4[4]Huang Y N, Shan M C.Policies in a resource manager of workflow systems:mo deling, enforcement and management [R]. Palo Alto: HP Software Technology Labo ratory Technical Report HPL-98-156,1998.
  • 5[5]Gryz J. Query rewriting using views in the presence of functional and inc lusion dependencies [J]. Information System,1999,24(7):597-612 .
  • 6Bellenguez O, N6ron E. A branch-and-bound method for solving multi-skill project scheduling problem [ J ]. RAIRO- Operations Research ,2007,41 (2) : 155 - 170.
  • 7Heimerl C, Kolisch R. Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level targets [ J ]. International Journal of Production Research ,2010,48 ( 13 ) :3759 - 3781.
  • 8Li H, Womer K. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm [ J ]. Journal of Scheduling, 2009, 12 ( 3 ) : 281 - 298.
  • 9Wu M C, Sun S H. A project scheduling and staff assignment model considering learning effect [ J ]. The International Journal of Advanced Manufacturing Technology, 2006, 28 (11/12) :1190 -1195.
  • 10Tiwari V, Patterson J H, Mabert V A. Scheduling projects with heterogeneous resources to meet time and quality objectives [ J ]. European Journal of Operational Research, 2009,193 (3) :780 - 790.

共引文献18

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部