摘要 基于Auto CAD和Inventor三维建模软件平台,建立某国产三代核电机组一回路主系统的三维实体模型,运用Simulation CFD软件模拟一回路主系统的相关设备在不同工况下运行时的压力场和温度场,揭示了冷热流交混、机组启停过程中热疲劳现象的作用机理,为核电站一回路主系统的性能分析和疲劳监测系统的开发提供了参考。 This paper uses Auto CAD and Inventor software to build a three-dimensional solid model based on the primary loop main system of a domestic nuclear power unit.Simulation CFD software is used to simulate the pressure and temperature fields of the main equipment of the primary loop main system.The result reveals several common fatigue mechanism and have some significance to the property analysis of primary loop main system and design of fatigue monitoring system.
出处 《工业控制计算机》 2016年第1期77-79,共3页 Industrial Control Computer
关键词 核电站 一回路 三维仿真 热疲劳 nuclear power plant primary loop three-dimensional simulation thermal fatigue
  • 相关文献

参考文献5

  • 1王枵天.核电站一回路中应用的阀门和驱动装置[C]∥中国石油和石油化工设备工业协会、北京阀门研究所.2011年首届阀门技术研讨会资料汇编.北京,2011:8.
  • 2张凯选,闫野,魏来.CAD下三维建模研究[J].计算机系统应用,2012,21(2):192-195. 被引量:12
  • 3张慧.解密“华龙一号”[J].能源,2014(4):38-45. 被引量:6
  • 4吴晓震,余伟炜,张彦召,薛飞,刘伟,束国刚.压水堆核电站疲劳监测系统分析[J].华东电力,2013,41(11):2398-2403. 被引量:11
  • 5Gyeong-Hoi Koo, Jong-Jooh Kwon, Wanjae Kim.Green's function method with consideration of temperature dependent material properties for fatigue monitoring of nuclear power plants {J].lnternational Journal of Pressure Vessels and Pip- ing. 2009.86(2-3):p. 187-195.

二级参考文献17

  • 1申胜利,李华.基于ArcEngine的ArcGIS与AutoCAD数据转换研究[J].测绘通报,2007(2):41-43. 被引量:35
  • 2单岩,吴立军.CAD实用技术.北京:清华大学出版社.2004.
  • 3Meng KT, Wang DL, Henderson TJ. Three-Dimensional Modeling of Complex Fusion Devices Using CAD-MCNPX Interface Tantges, Laila EI-Guebaly September 2004.
  • 4PACHNER J. Assessment and management of ageing of major nuclear power plan! components important to safety Primary piping in PWRs[ R]. IAEA TECDOC-1361, 2003.
  • 5CAREY J. Operating experience regarding thermal fatigue of unisolable piping connected to PWR reactor coolant systems [ R]. EPRI Report No. 1001006, 2000,.
  • 6NRC Bulletin 79-13, Revision 2, Cracking in Feedwater Sys- tem Piping[ N]. June 1979.
  • 7BIMONT G, AUFORT P. Fatigue Monitoring in Nuclear Power' Plant [ C ]. Transactions of the 9th, International Con- ference on SMiRT, Lausanne, Switzerland, August, 1987, 133-140.
  • 8NRC Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant Systems[ N ]. April 11, 1989.
  • 9NRC Bulletin 88-11, Pressurizer Surge l.ine Thermal Stratifi- cation[ N]. December 10, 1988.
  • 10GR1ESBACH T J. FatiguePro: An On-Line Fatigue Usage Transient Monitoring System tbr Nuclear Power Plants [ R ]. EPRI Report No. NP-5835. 1988.

共引文献26

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部