期刊文献+

基于流程改进的燃气工程项目进度控制研究

Gas Engineering Project Progress Control Research Based on the Process Improvement
下载PDF
导出
摘要 随着新型城镇快速发展,居民日常生活水平显著提高,所需燃气供不应求,燃气工程施工项目逐渐增多。进度是燃气工程施工项目管控的重要部分。论文剖析现行燃气工程项目进度控制存在的问题,探讨基于流程改进的燃气工程项目的进度控制手段及实现保障机制。该项研究能有效实现对燃气项目的进度控制,提高效益。 With the rapid development of new towns, people's daily living standards improved significantly, the demand for gas in various provinces and cities is in short supply, and the construction projects of gas projects are gradually increasing. Schedule control is an important part of project management and control. This paper analyzes the existing problems in the current control of gas engineering project, and discusses the progress control method of gas engineering project schedule control based on process improvement. Hope this research can effectively realize the gas project progress control, improve business.
出处 《工程建设与设计》 2016年第3期143-146,149,共5页 Construction & Design for Engineering
关键词 燃气工程项目 进度控制 流程改进 项目管控 gas projects schedule control process improvement the project control
  • 相关文献

参考文献5

二级参考文献12

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部