5ZHANG Ji-xiong, ZHANG Dong-sheng. Driving predriven roadway for coalface passing rapidly through fault and disposing of associated waste in undergroung[C]// M Hardygbra, G Paszkowska, M Sikora. Proceedings of the Thirteenth International Symposium on Mine Planning and Equipment Selection. Rotterdom: A A Balkema, 2004:341-345.
6[1]俞启香.矿井瓦斯大林防治[M].徐州:中国矿业大学出版社,1993.
7[7]XU Jia-lin,LAI Wen-qi,QIAN Ming-gao.An approach to developing prospect and technical ways of fill mining in Chinese Collieries[J].Mining Research and Development,2004,24(109):26-30.