摘要
以港珠澳大桥珠海连接线管线迁改工程为例,分析了该管线迁改项目的特点、重点及难点,并制定了项目开展的技术方案,从设计条件、既有管线保护等方面,总结了项目设计过程中的注意事项,从而确保了项目建设的顺利实施。
Taking Zhuhai connection-line pipeline transformation engineering of Gangzhu'ao bridge as an example,the paper analyzes the pipeline transformation project features,points and difficulties,and formulates the project launching technology scheme,and finally summarizes matters needing attention in the project design process from aspects of design conditions and existing pipeline protection,so as to guarantee the project construction smooth.
出处
《山西建筑》
2016年第7期232-234,共3页
Shanxi Architecture
关键词
管线迁改
项目组织
高架桥梁
注意事项
pipeline transformation
project organization
elevated bridge
matters