结合城中村安置工程实例,从工程量清单的描述、核对及招标控制价的确定、审核等方面,分析了工程招标控制价编制过程中存在的问题,并提出了针对性的解决方法,从而使招标控制价的编制更具科学性、合理性。
Combining with the urban village resettlement engineering example,from the BOQ description,checking and tender control price determination,audit and other aspects,analyzed the existing problems in engineering tender control price establishment process,and put forward corresponding solution,so as to make the tender control price compilation more scientific and reasonable.
出处
《山西建筑》
2016年第7期239-240,共2页
Shanxi Architecture