摘要
详细分析了汽轮机在调试期间出现真空异常的原因,提出了切实可行的措施,有效地解决了问题,确保了机组顺利投运。
The causes of vacuum abnormality during commissioning of steam turbine were analyzed and practical and feasible measures put forward, which effectively solved the problem and ensured smooth commissioning of the generator unit.