摘要
介绍了华润贵州天堂界风电场35 kV集电线路及110 kV升压站电气一次设计特点。详细论述了中高山地、重覆冰区架空线路和电缆线路的优缺点,说明了升压站电气主接线方案,主要设备选择,防雷接地设计等,对类似工程具有参考意义。
This text introduces the design features of the 35 kV collector line and the 110 kV booster station of Tiantangjie wind power plant in Guizhou Province.It discusses in detail the advantages and disadvantages of the overhead lines and cable lines in mountainous area and heavy icing regions,and describes the main electrical connection scheme of booster station,main equipment selection,lightning protection and grounding design,etc.,which provides reference for similar projects.
出处
《水利水电工程设计》
2016年第1期34-35,共2页
Design of Water Resources & Hydroelectric Engineering
关键词
电气主接线
集电线路
无功补偿
过电压保护
天堂界风电场
main electrical connection
collector line
reactive compensation
over-voltage protection