期刊文献+

筋带对尾矿坝漫坝破坏过程阻滞作用试验研究 被引量:15

Experimental study on blocking action of bar strip on tailings dam overtopping
下载PDF
导出
摘要 为分析筋带在尾矿坝漫坝破坏过程中的阻滞性,基于相似理论和溃决侵蚀原理,进行加筋尾矿坝漫顶破坏模型试验。深入剖析加筋尾矿堆积坝漫顶演化规律和破坏模式,揭示筋带在尾矿坝漫顶破坏过程中的阻滞效应。结果表明:加筋尾矿坝的浸润线上升滞后于未加筋情况;加筋尾矿坝漫坝破坏呈台阶破坏模式;筋带对尾矿坝漫坝破坏发展速度和侵蚀沟深宽有明显的阻滞作用。采取尾矿坝加筋措施能有效防御洪水漫顶溃坝灾害。 For the sake of studying the blocking effect of bar strip on tailings dam overtopping,the similarity theory and principle of burst erosion model were used to establish an evolution model of reinforced tailings dam under the flood condition,and the floating evolution of reinforced tailings dam was analyzed.the evolution law and failure mode of tailings stacking dam were analyzed,and the blocking effect of reinforced belts on overtopping destruction was revealed. The results indicate that rise in the saturation line of tailings dam is delayed by bar strips,that overtopping process of reinforced tailings dam has a steps failure mode,that bar strips have a significant blocking effect on the process of tailings dam destruction and the width of erosion gully,and that the reinforcement measure can be used to prevent effectively dam overtopping disasters.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2016年第1期94-99,共6页 China Safety Science Journal
基金 国家自然科学基金资助(51404049) 重庆市教委科学技术研究项目(KJ1501328) 重庆科技学院重点项目培育基金资助(CK2014Z12) 重庆科技学院安全风险与控制团队基金资助 重庆市地质矿产勘查开发局科技项目
关键词 尾矿坝 漫顶溃坝 加筋 阻滞特性 模型试验 tailings dam dam overtopping reinforcement block action model experiment
  • 相关文献

参考文献18

  • 1KEMPER T, SOMMER S. Estimate of heavy metal contamination in soils after a mining accident using reflectance spec- troscopy[J] .Environmental Science and Technology, 2002, 36(12) :2 742-2 747.
  • 2MARCUS W A, MEYER G A, NIMMO D R. Geomorphic control of persistent mine impacts in a Yellowstone Park stream and implications for the recovery of fluvial systems[J]. Geology,2001,29(4) :355-358.
  • 3FOURIE A B, BLIGHT G E, PAPAGEORGIOU G. Static liquefaction as apossible explanation for the merrie spruit tail- ings dam failure E J]. Canadian Geotechnical Journal, 2001,37 (4) : 707-719.
  • 4HARDER L F J, STEWART J P. Failure of Tapo-Canyon tailings dam[J].Journal of Performance of Constructed Facili- ties, 1996,10(3) :109-114.
  • 5BLIGHT G E. Destructive mudflows as a consequence of tailings dyke failures[J].Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 1997,125 ( 1 ) : 9-18.
  • 6CHANDLER R J, TOSATTI G. Thestava tailings dams failure, Italy, July 1985[J].Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 1995,113(2) :67-79.
  • 7VICK S G. Tailings dam failure at Omai in Guyanal-J3.Mining Engineering, 1996,48( 11):34-37.
  • 8MCDERMOTT R K, SIBLEY J M. Aznalcollar tailings dam accident a case studyFJJ.Mineral Resources Engineering, 2000. 9(1) :101-118.
  • 9尹光志,魏作安,万玲,张东明.细粒尾矿堆坝加筋加固模型试验研究[J].岩石力学与工程学报,2005,24(6):1030-1034. 被引量:32
  • 10何友芳,尹光志,张东明.土工格栅与铜矿尾矿界面作用特性的实验研究[J].重庆建筑大学学报,2006,28(2):86-88. 被引量:8

二级参考文献121

共引文献192

同被引文献179

引证文献15

二级引证文献70

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部