祥光二期旋浮吹炼炉生产实践及优化 被引量:2

Production Practice & Optimization of Vortex Floating Converting in Xiangguang Ⅱ Phase Furnace
下载PDF
导出
摘要 祥光铜业一期工程是国内首家采用奥托昆普闪速熔炼+闪速吹炼工艺的铜冶炼厂,2011年二期对接时对吹炼炉进行了改造,将核心设备冰铜喷嘴改为具有祥光自主知识产权的旋流冰铜喷嘴,投产后经摸索创新,克服了喷嘴粘接,耐火材料冲刷,上升烟道粘接等技术难题,生产稳定,生产能力达到了年生产45万t粗铜,着重介绍了旋浮吹炼炉的生产遇到的问题及解决方案,展望了下一炉期检修计划。 TheⅠphase of the project in Xiangguang Copper is the first domestic smelter by using the Outokumpu "Flash Smelting and Flash Converting process". The converting furnace was reformed during theⅡphase of the project butted joint successfully in 2011. The core equipment of matte nozzle has beenreplaced by the pulsating vortex nozzle with the proprietary intellectual property rights of Xiangguang Copper. After the commissioning of the exploration innovation, technical problems such as the adhesion on nozzle and the up-shaft outlet of flash furnace, the erosion on refractory etc. were overcomed. With the stability of production, the production capacity of blister copper has reached 450,000 tons annually. The problems occurred during production and solutions in vortex flash converting furnace were emphatically introduced in this article. The next stage of furnace maintenance plan was prospected in this paper.
作者 董广刚 何静
出处 《铜业工程》 CAS 2016年第1期51-53,61,共4页 Copper Engineering
关键词 脉动旋流冰铜喷嘴 喷嘴粘接 耐火材料冲刷 上升烟道粘结 解决方案 检修计划 pulsating vortex matte nozzle adhesion on nozzle erosion on refractory adhesion up-shaft outlet solutions of problem maintenance plan
  • 相关文献

参考文献8

二级参考文献23

  • 1昂正同.闪速炉处理高Pb、Zn、As精矿的探讨[J].有色金属(冶炼部分),2005(1):32-35. 被引量:10
  • 2南昌有色冶金设计研究院主编.阳谷祥光铜业有限公司年产40万吨阴极铜(一期20万吨)工程初步设计(第一卷)[M].南昌:南昌有色冶金设计研究院,2005.
  • 3傅崇说主编.有色冶金原理(第2版)[M].冶金工业出版社.
  • 4黄其兴.智利特尼恩特炉铜熔炼技术的改进[C].中国首届熔池熔炼技术及装备专题研讨会论文集,2007.
  • 5Koh P T L, Jorgensen F R A, Elliot B J. Solids Falling in Flash Furnace Burner Concentrate Chutes [J]. Int. J. Miner. Process., 2007, 83: 81-88.
  • 6Debrincat D P, Solnordal C B, Van Deventer J S J. Influence of Particle Properties on the Size of Agglomerated Metallurgical Powders [J]. Int. J. Miner. Process., 2008, 87: 17-27.
  • 7Solnordal C B, Jorgensen F R A, Koh P T L. CFD Modelling of the Flow and Reactions in the Olympic Dam Flash Furnace Smelter Reaction Shaft [J]. Applied Mathematical Modelling, 2006, 30 1310-1325.
  • 8Higgins D R, Gray N B, Davidson M R. Simulating Particle Agglomeration in the Flash Smelting Reaction Shaft [J]. Miner. Eng., 2009, 22: 1251-1265.
  • 9Chen Z, Wang Y X. Simulation Study of Intensified Flash Smelting Process [A]. Dipl. Ing. Jens Harre. GDBM. Copper 2010 [C]. Hamburg: Papierflieger, 2010. 1313-1323.
  • 10南昌有色冶金设计研究院.阳谷祥光铜业有限公司年产40万吨阴极铜(一期20万吨)工程初步设计[R]南昌:南昌有色冶金设计研究院,2005.

共引文献46

同被引文献24

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部