摘要
针对太原市迎宾路北侧的东兴大厦工程,分析其在施工过程中存在的问题,提出解决问题的具体办法。此办法可有效地解决存在的问题,施工后楼板质量达到设计要求,不仅缩短了工程进度,而且使成本得到了有效控制。
As to Dongxing mansion engineering in north of Taiyuan Yingbin Road, this paper analyzes the problems existing in the construction process, and puts forward specific measures to solve the problem. This method effectively salves the existing problems. After the construction, the floor quality meets the design requirements, which not only shortens the project schedule, but also effectively controls the cost.
出处
《山西冶金》
CAS
2016年第1期97-98,共2页
Shanxi Metallurgy
关键词
现浇砼空心楼盖
内模
抗浮
定位
cast-in-place hollow ceiling, internal model, anti-floating, positioning