1140 MVA三相一体主变选型及运行实践 被引量:1

Type Selection of 1140 MVA Three-phase Main Transformer and Operation Practice
下载PDF
导出
摘要 铜陵发电厂六期#5机组是安徽省首台单机容量为1000MW的超超临界发电机组,通过主变压器升压至500kV接入华东电网,该主变压器为三相一体变压器,在百万机组选型中尚属首次采用。三相一体变压器在制造、布置、运行中具有明显的优势,提高了供电的经济性及可靠性。但该变压器在运行初期也碰到了低压侧升高座温度高的问题,经多方分析处理,最终在检修中解决了温度高的问题,目前变压器运行状况良好。 No.5 unit of Tongling Power Plant Phase 6 is the first power generator unit with the capacity of 1000MW in Anhui Province. It access to East China power grid through the main transformer increasing to 500kV. The Main Transformer is a three-phase transformer which is first adopted in one million units. The three-phase transformer has obvious advantages in manufacturing, layout and operation, which improves the economy and reliability of power supply. But the transformer also encountered the low pressure side of a high temperature rising problem in the early operation. After the analysis, we finally solved the problem of high temperature in the maintenance. The transformer currently runs in good condition.
出处 《电力勘测设计》 2016年第1期44-48,共5页 Electric Power Survey & Design
关键词 发电厂 变压器 三相一体 可靠性 power Plant transformer three-phase reliability
  • 相关文献

参考文献5

  • 1西北电力设计院.主变选型专题报告[R].西安:两北电力设计院,2007.
  • 2GB6451-2008,三相油浸式电力变堆器技术参数和要求[S].
  • 3GB1094.2-2013,电力变压器第2部分:液浸式变压器的温升[S].
  • 4西北电力设计院.电力工程电气设计手册(1)[M].北京:水利电力出版社,1989.
  • 5DL5000--2000,火力发电厂设计技术规程[S].

共引文献8

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部