摘要
基坑挖土及底板浇筑是大型深基坑工程的重要部分,其施工质量高低直接影响基坑的稳定与安全。结合具体工程,介绍了深基坑局部深坑土方开挖及支撑体系的优化措施,工程实践验证了这些优化措施既节约了工期,又产生了可观的经济效益,其经验可为其他同类工程提供借鉴。
Foundation excavation and bottom slab concreting are important parts of large-scale deep foundation pit engineering, good or poor construction quality directly affects the stability and safety of foundation pit. Combined with specific engineering, optimization measures of partial deep pit earth excavation and support system in deep foundation pit has been introduced,and the engineering practice proved that these optimization measures not only saved construction period but also created considerable economic benefits, these experience can provide references for other similar projects.
出处
《建筑施工》
2016年第2期119-121,共3页
Building Construction
关键词
局部深坑
土方开挖
底板浇筑
支撑体系
优化措施
partial deep pit
earth excavation
bottom slab concreting
support system
optimization measure