摘要
介绍了店坡梁沟骨干坝的基本情况、工程现状、设计标准及枢纽组成,阐述了店坡梁沟骨干坝进行除险加固的必要性,对店坡梁沟骨干坝加固设计进行了综述。
This paper introduces the basic situation, engineering status, design standard and hub composition of the backbone dam in Dianpoliang Ravine, expounds the necessity of carrying out the reinforcement of the backbone dam in Dianpoliang Ravine, and reviews the reinforcement design of the backbone dam in Dianpoliang Ravine.
出处
《山西科技》
2016年第1期98-103,共6页
Shanxi Science and Technology
关键词
店坡梁沟骨干坝
除险加固设计
水文计算
backbone dam in Dianpoliang Ravine
reinforcement design
hydrological calculation